Frequency Deviations In Continental Europe Are Causing Electric Clocks To Run Behind By 5 Minutes

Frequency Deviations In Continental Europe Are Causing Electric Clocks To Run Behind By 5 Minutes

  • March 6, 2018
Table of Contents

![Frequency Deviations In Continental Europe Are Causing Electric Clocks To Run Behind By 5 Minutes](https://www.entsoe.eu/Style Library/EntsoePublishingBranding/Images/favicon.ico?rev=23)

Continental European Power System has been experiencing, since mid-January, continuous significant power deviations due to shortage in supply from one transmission system operator of the interconnected system. All actions are taken by the TSOs of Continental Europe and by ENTSO-E to resolve the situation.

Source: entsoe.eu

Tags :
Share :
comments powered by Disqus

Related Posts

Insulator or superconductor? Physicists find graphene is both

Insulator or superconductor? Physicists find graphene is both

Physicists at MIT and Harvard University have found that graphene, a lacy, honeycomb-like sheet of carbon atoms, can behave at two electrical extremes: as an insulator, in which electrons are completely blocked from flowing; and as a superconductor, in which electrical current can stream through without resistance.

Read More
First firing of air-breathing Electric Truster

First firing of air-breathing Electric Truster

In a world-first, an ESA-led team has built and fired an electric thruster to ingest scarce air molecules from the top of the atmosphere for propellant, opening the way to satellites flying in very low orbits for years on end.

Read More